CORPORATE STANDARD LIST OF ACRONYMS
Acronym |
Name |
Description (If Applicable) |
|
AC |
Alternating Current |
||
APAC |
Asia Pacific |
||
AIA |
Approved Inspection Authority |
Alternative is IVB |
|
ALST |
Assistant Life Support Technician |
||
AODC |
Association of Offshore Diving Contractors |
||
APME |
Asia Pacific and Middle East |
||
ATA |
Atmospheres (Absolute) |
||
ATC |
Authorisation to Commit |
Financial or Operation Terms |
|
ATM |
Atmospheres (Gauge) |
||
ATS |
Atmospheres (Gauge) |
||
ATT |
Authorisation to Tender |
In Business Development Terminology |
|
BARA |
Bar Absolute |
||
BARG |
Bar Gauge |
||
BIBS |
Built in Breathing System |
||
BMS |
Business Management System |
||
BPMS |
Business Process Management System |
||
BR |
Brazil |
||
BU |
Business Unit |
||
BS |
British Standard |
||
CAA |
Civil Aviation Authority |
||
CBS |
Cost Breakdown Structure |
Works with Work Break Down Structure. Company works only of a WBS with Integrated Costs |
|
CCS |
Contract Control Schedule |
||
CDM |
Controls and Data Management |
||
CRMS |
Company Risk Management System |
||
CMTU |
Communication Module Test Unit |
||
CNS |
Central Nervous System |
||
CSA |
Cost Sensitivity Analysis |
||
CO |
Carbon Monoxide |
||
COP |
Crane Operator |
||
CO2 |
Cardon Dioxide |
||
DC |
Direct Current |
||
DE |
Detailed Engineering |
||
DCS/DCI |
Decompression Sickness / Illness |
||
DDC |
Deck Decompression Chamber |
||
DESIGN |
Diving Equipment System Inspection Guidance Note |
||
DMAC |
Diving Medical Advisory Committee |
||
DOA |
Delegation of Authority |
||
DP |
Dynamically Positioned / Dynamic Positioning |
||
DPVOA |
Dynamic Positioning Vessels Operators Association |
||
D Supt |
Diving Superintendent |
Otherwise called OPM |
|
DS |
Diving Supervisor |
||
DVR |
Diver |
||
DRV |
Designated Rescue Vessel |
||
DSV |
Diving Support Vessel |
||
ECT |
Emergency Control Team |
||
ECU |
Environmental Control unit |
||
EDU |
Electrical Distribution Unit |
||
EFAT |
Extended Factory Acceptance Test |
||
EHXT |
Enhanced Horizontal Christmas Tree |
||
EL |
Entrance Lock |
||
EPCI |
Engineering Procurement Construction Installation |
||
ET |
Electrical Technician |
||
EPF |
Engineered Pipe and Fittings |
||
EPU |
Electrical Power Unit |
||
ER |
Eastern Region |
||
ETA |
Estimated Time of Arrival |
||
ETD |
Estimated Time of Departure |
||
ETU |
Electronic Test Unit |
||
EVDT |
Enhanced Vertical Christmas Tree |
||
FMEA |
Failure Mode Effects Analysis |
||
FMECA |
Failure Mode Effects & Criticality Analysis |
||
FSW |
Feet of Seawater |
||
FP |
Final Pressure |
||
FV |
Floodable Volume |
||
GBU |
Global Business Unit |
Surface, Onshore/Offshore, Projects, Subsea Services |
|
GI |
Group Instruction |
||
HAZID |
Hazard Identification |
||
HAZOB |
Hazard Observation |
||
HAZOP |
Hazard Operability Study |
||
HCU |
Habitat Conditioning Unit |
||
HDM |
Hydraulic Distribution Module |
||
HEU |
Hyperbaric Evacuation Unit |
IMO word for HRC and SPHL or HLB or HRL |
|
HLB |
Hyperbaric Lifeboat |
||
HP |
High Pressure |
||
HPU |
Hydraulic Power Unit |
||
HRL |
Hyperbaric Rescue Lifeboat |
||
HRC |
Hyperbaric Rescue Chamber |
||
HS |
Hydraulic Systems |
||
HSE |
Health and Safety Executive |
||
IBMS |
Integrated Business Management System |
Alternative Name for CRMS or BMS |
|
ICPO |
Intercompany Purchase Order |
||
IMCA |
International Marine Contractors Association |
||
IMO |
International Maritime Organisation |
||
IMR or IRM |
Inspection Maintenance and Repair |
||
IP |
|
||
ISO |
International Standards Organisation |
||
IPP |
Internal Product Provider |
||
ISP |
Internal Service Provider |
||
IVB |
Independent Verification Body i.e. ‐ ABS |
AIA – Approved Inspection Authority |
|
IWOCS |
Installation Work Over Completion System |
||
JV |
Joint Venture |
||
KOM |
Kick Off Meeting |
||
LD |
Lead Diver |
||
LP |
Low Pressure |
||
LSP |
Life Support Package |
||
LSS |
Life Support Supervisor |
||
LST |
Life Support Technician |
||
LAT |
Lowest Astronomical Tide |
||
LTA |
Lost Time Accident |
||
MCS |
Master Control Station |
||
MEL |
Maximum Exposure Limit |
||
ML |
Main Lock |
||
MPI |
Magnetic Particle Inspection |
||
MPS |
Manifold and Pipeline Systems |
||
MRCC |
Marine Rescue Coordination Centre |
||
MSV |
Multi Role Support Vessel |
||
MSW |
Metres Sea/Salt Water |
||
MT |
Mechanical Technician |
||
MWA |
Mid Water Arch |
||
NAM |
North America |
||
NCR |
Non-Conformance Report |
||
NDT |
Non-Destructive Testing |
||
NLTA |
Non-Lost Time Accident |
||
NORSOK |
Standards Developed by the Norwegian Petroleum Industry |
||
NSC |
North Sea Canada |
||
OBS |
Organisational Breakdown Structure |
Common for WBS |
|
OBSROV |
Observation Class ROV |
||
OBG |
Onboard Gas |
||
OES |
Occupational Exposure Standards |
||
OIM |
Offshore Installation Manager |
||
OE |
One Engineering |
||
OED |
Offshore Engineering Division |
Management of research and development projects, Providing technical support to project and fleet support teams, Consolidation of best design and operational practices |
|
PCG |
Parent Company Guarantee |
||
PDT |
Product Delivery Team |
||
PEM |
Project Engineering Manager |
||
PEP |
Project Execution Plan |
||
PL |
Product Line |
||
PLM |
Product Lifecycle Maintenance |
||
PMR |
Project Management Report |
||
PMT |
Project Management Team |
||
PO |
Purchase Order |
||
PP |
Partial Pressure |
||
PPM |
Parts Per Million |
||
PSIA |
Pounds per Square Inch (Absolute) |
||
PSIG |
Pounds per Square Inch (Gauge) |
||
PPCO2 |
Partial Pressure CO2 |
||
PPO2 |
Partial Pressure O2 |
||
PTFE |
Teflon Thread Tape |
||
PVC |
Poly Vinyl Chloride |
||
QA |
Quality Assurance |
||
QC |
Quality Control |
||
QHSE |
Quality, Health, Safety and Environment |
||
RAW |
Risk Assessment Workshop |
||
RBU |
Regional Business Unit |
||
RCC |
Rescue Co-ordination Centre |
||
ROV |
Remote Operated Vehicle |
||
R&D |
Research and Design |
||
RR |
Risk Register |
||
RV |
Residual Volume |
||
RVs |
Rescue Vessel |
||
SA |
South America (Includes Brazil) |
||
SCUBA |
Self-Contained Underwater Breathing Apparatus |
||
SDC |
Submersible Decompression Chamber |
||
SD |
Standby Diver |
||
SE |
Surface Equivalent |
||
SLS |
Secondary Life Support (Rebreather Bailout) |
||
SWL |
Safe Working load |
||
ST |
Saturation Technician |
||
SC |
Steering Committee |
Decision making forum set up to assist in successful delivery of a project |
|
SCM |
Subsea Control Module |
||
SE |
System Engineering |
||
SIT |
System Integration Test |
||
SPS |
Subsea Production Systems |
||
SSC |
Standard Subsea Components |
||
SSE |
Sub‐System Engineering |
||
SURF |
Subsea Umbilical’s Risers and Flowlines |
Typically referred to as traditional Scope of work |
|
SWAY |
Office Sway is a presentation program and is part of the Microsoft Office family of products |
Generally released by Microsoft in August 2015, Sway allows users who have a Microsoft account to combine text and media to create a presentable website. |
|
TL |
Transfer Lock |
||
TUP |
Transfer under pressure |
||
TV |
Tidal Volume |
||
T&I |
Transportation and Installation |
||
TMS |
Thermal Management Systems |
||
UCOS |
Automation and Control |
||
UHV |
Ultra-High Frequency |
||
UKOOA |
UK Offshore Operator Association |
||
UPTD |
Unit Pulmonary Toxicity Dose |
||
UT |
Ultrasonic Testing |
||
VDT |
Vessel Delivery Team |
Specialist & dedicated team responsible for delivery of operations support for a key asset (Two Currently) |
|
VHF |
Very High Frequency |
||
WBS |
Work Breakdown Structure |
||
WCS |
Well Completion Systems |
||
WR |
Western Region |
||
XT |
Christmas Tree |
Main product in WCS product line |